The Dorchester
Website

Website
Length of working relationship
21 Years
Success Story
Suffering from recurring pump failure, Flow-Right were engaged to overhaul the pump station. The station was converted from a wet well system to a dry well system with the pumps positioned outside of the existing 12000 litre tank. Independent outlet lines for each pump were installed as well as a dedicated extraction line for maintenance.
Services
Hot and Cold Water
Pumps
Drainage
Tanker
Special Projects
Investigations
FUN FACT!
When it was built, approximately 40000 tonnes of earth was removed for the hotel basement.
Related
Four Seasons
The mechanical floats controlling the level in the pump station were found to…